Timeline: Refurbishing an Old House

26 November 2023

Refurbishing an Old House: A Comprehensive Timeline for Home Renovations in the UK

Deciding to renovate an old house in the UK can be an exciting and rewarding project. However, the process involves numerous steps and considerations, from engaging architects and obtaining planning permissions to hiring builders and completing internal electrics and decoration.

In this article, our expert builders for house renovations will guide you through a comprehensive timeline, outlining the key stages and factors to consider when undertaking home renovations, building renovations, barn conversions, outbuilding conversions, reconfiguring buildings or even just a loft conversion in the UK.

1. Preliminary Research (2-3 months)

Before embarking on any renovation project, it is crucial to conduct thorough research. Start by defining your goals, budget, and priorities. Consider engaging an architect, builder or a renovation specialist who can provide guidance and insights into the feasibility of your plans and any potential structural or planning constraints.

2. Develop Design Plans (1-2 months)

Collaborate with your chosen architect or building designer to develop detailed design plans for your renovation. This stage involves conceptual drawings, layouts, and material selections. Engage in frequent discussions with your architect to ensure the plans align with your vision while adhering to relevant building regulations and planning permissions. Note that planning permissions can vary depending on where your property is located. For instance if your property is in the centre of Bath, Somerset you may have stricter compliances than a rural barn or a house in Calne or Devizes, Wiltshire

3. Planning Permissions and Legalities (3-6 months +)

Check if your proposed renovation requires planning permission from your local council planning authority. The duration of this process varies, so it is advisable to start early. Your architect will assist you with the necessary documentation and submission to obtain planning approval.

4. Engaging Builders and Contractors (1 month)

Once planning permission is granted, it's time to engage builders and contractors who specialise in the type of renovation you are undertaking. Obtain multiple quotes and evaluate each contractor's experience, references, and credentials. Sign a detailed contract with the chosen builder, clearly defining the scope of work, timeline, and payment terms.

5. Structural and External Renovations (3-6 months)

At this stage, the focus is on structural modifications, roofing, and external renovations. This includes major tasks such as reconfiguring buildings, barn conversions, and outbuilding conversions. Builders will work according to the plans and specifications laid out in the contract. If you need help then please do ask us as we specialise in renovations and reconfiguring buildings.

READ MORE

6. Internal Electrics and Plumbing (1-2 months)

Once the structure is in place, it is time to focus on internal electrics and plumbing. Hire qualified electricians and plumbers to ensure compliance with regulations and the safe and efficient installation of internal systems. If you need help, then please do ask us as we have a range of excellent contractors on hand for internal works.

7. Insulation and Energy Efficiency (1-2 weeks)

In line with modern standards, prioritise insulation and energy efficiency during your renovation. Install appropriate insulation materials, energy-efficient windows, and consider renewable energy options like solar panels or air source heat pumps.

8. Interior Decoration and Finishes (1-3 months)

The final stage involves interior decoration, including flooring, wall finishes, paintwork, and fixtures. Take time to carefully select materials, colours, and styles that align with your desired aesthetic.

9. Completion and Final Checks (1-2 weeks)

Once the renovation work is complete, conduct a thorough inspection with the builder to ensure everything is finished to your satisfaction and meets building regulations. Arrange for any necessary rectifications or adjustments before signing off on the project.

10. Moving In and Enjoying Your Renovated Home!

With the renovation completed, it's time to savour the fruits of your labour (and those of the builders) and enjoy your transformed living space. Take pride in the work you have accomplished and the new life you have breathed into your old house.

Remember, timelines may vary depending on the scale and complexity of your renovation project. It is essential to have contingency plans in place for unforeseen delays or challenges that may arise along the way.

With proper planning, careful selection of professionals, and effective communication, your home renovation journey will be as smooth and rewarding as possible.

READ MORE

Best of luck with your renovation project!